Caltrans District 04


Annual Energy Savings
1,240 MMBTU


Annual Cost Savings
$55,996

Simple Pay Back
6.9 years


Building Area
525,500 SF


Date of Completion
March 2018


Project Overview

BTU Engineers worked on the Caltrans District 04 Office Building in Oakland, CA. The total conditioned space is 525,000 sq. ft. for this facility. We provided LEED-EBOM services for this building. This building earned a LEED Gold status under v4. BTU Engineers performed ASHRAE 62.1 calculations, ASHRAE level 1 audit, and water-saving calculations.

LEED Gold
Alternative Transportation 15/15
Sustainable Sites: 3 / 10
Water Efficiency: 9 / 12
Energy and Atmosphere: 17 / 38
Materials and Resources: 4 / 8
Indoor Environmental Quality: 9 / 17
Innovation and Design: 3 / 6