IMAX HQ

Types of Systems Commissioned
• HVAC and Controls
• Lighting and Controls
• Electric Diesel Generator
• ATS, UPS, and Batteries
• Plumbing Systems
• Landscape and Irrigation


Building Area
66,943 SF

Date of Completion
February 2016

Type of Commissioning
CALGreen Cx


Electrical Generator_IMAX

Air Cooled Chiller_IMAX


Project Overview

BTU Engineers served as the Commissioning Authority (CA) for the IMAX West Coast Headquarters building, providing CALGreen Commissioning.
The subject property is located in Los Angeles, CA. The IMAX building is a 3-story office and cinema building with 66,943 SF. Some Project Sites and facilities are within the Area’s Historic Resources Treatment Plan (HRTP) Transition Zone.

BTU Engineers commissioned the basic HVAC, lighting, and plumbing systems for this project and commissioned UPS, batteries, automatic transfer switches, power distribution units, and electrical generators.