Skip to content

Platform, CA

    Types of Systems Modeled
    • VRV Systems
    • RTU & Split Systems
    • Ventilation Systems
    • Photo Voltaic Systems
    • Lighting & Daylighting
    • Plumbing Systems


    Total Energy Saved
    Building A: 670 MMBTU
    Building B: 255 MMBTU
    Building C: 132 MMBTU
    Building D: 120 MMBTU
    Building E: 1,433 MMBTU
    Building F: 207 MMBTU


    Date of Completion
    February 2013


    Energy Model Platform Bldg EBuilding C

    platform


    Project Overview

    BTU Engineers provided energy modeling and LEED commissioning for 6 buildings in Culver City, CA. The total area is approximately 41,253 square feet of retail and restaurant, and 38,120 square feet of office. There are two above ground parking structures, one existing and the other new, which accommodates a total of 291 parking spaces.

    The Platform at Culver Station is a retail, office, and parking project that includes adaptive reuse of some existing buildings in conjunction with new construction to create a community oriented niche shopping environment with some office above. The broad theems that drive the design are transportation, pedestrian flow, and sustainability.