18,148 MMBTU
Annual Energy Savings
3,113 MMBTU
Annual Cost Savings
$152,866 (includes water savings)
Simple Pay Back
4.7 years
Building Area
722,207 SF
Date of Completion
September 2014
Exhaust Fan Infrared Image
Project Overview
BTU Engineers worked on a building located on Century Boulevard in Westchester, CA. The building consists of 17 stories, and the total building area is approximately 722,207 sq.ft. for this facility. This building is primarily an office area. There are four below grade parking floors beneath the first floor. First floor lobby consists of a deli and a small gift store. Other floors from the 2nd thru 17th are primarily office suites. The building was originally built in 1982 and occupied in 1989.
BTU Engineers performed an energy audit under the LADWP EETAP Program.