M & V Option
IPMVP – Option “D”
IPMVP – Option “D”
Energy Model Calibrated to
ASHRAE Guideline 14 Requirement
Meters
• Steam
• Chilled Water
• Electric
Date of Completion
June 2013
Project Overview
BTU Engineers staff worked on San Jose State University, Student Union building located in San Jose, California. The project comprises renovation of an existing 140,000 sq ft facility, and construction of new east and west wings totaling approximately 99,000 sq ft. The new structures are connected to the existing building.
BTU Engineer’s staff used International Performance Measurement and Verification Protocol (IPMVP) Option D Method to show building is operating according to the design documents. A baseline model was compared to actual energy usage in the building.